Large outdoor LED screen installed on a glass skyscraper facade at dusk

SHENZHEN LED DISPLAY FACTORY

COB LED Display & Crystal Film Screen Manufacturer

Factory-direct COB and MIP fine pitch displays, crystal film and creative installations for control rooms, retail and outdoor media. Engineered to the site, supplied with control guidance.

01 / 03
  • Documented quality

    Batch test reports travel with the shipment

  • Certified build

    CE · RoHS · FCC · UL · ISO 9001

  • 2–3 year warranty

    Modules, power supplies and control cards

  • 24h engineer reply

    A configuration answer, not an auto-reply

Why XL Technology

Numbers buyers can verify before they specify, and higher value at the same specification.

About Us
200,000:1
Native contrast

Six to ten times typical SMD panels, with deeper blacks in lit rooms.

44%
Lower power

Common-cathode design cuts running cost across the display's life.

>7680Hz
Flicker-free refresh

Clean capture on camera at any shutter angle.

Seamless CNC cabinets

600×337.5mm 16:9 cabinets with flatness ≤0.05mm.

Full-series coverage

Transparent, creative, COB P0.7–P1.9 and MIP P0.9–P1.8 from one factory.

Front-service modules

Hot-swap modules without rear access.

Factory-direct supply

No trading layers. 5–7 days for standard models.

Cost-performance

Same specification, lower total cost

The advantage comes from how the wall is built and supplied, not from cheaper components. Send any comparable quotation and we will return a line-by-line comparison of cabinet, power, control and spares cost.

Request a cost comparison

No trading layers

Quoted from the Shenzhen factory, with no agent margin between your order and production.

Up to 44% lower power

Common-cathode drive cuts electricity and heat load, reducing running cost across the service life.

Lower maintenance cost

Front-service modules and a documented spare ratio shorten downtime and site visits.

Line-by-line comparison

Cabinet, power supply, control system and spare parts are listed separately, so you can compare the same scope rather than a headline price.

COB or MIP? Compare Before You Specify.

Three LED technologies, one decision: the image, the budget and the installation environment.

ParameterCOBMIPSMD
Contrast ratio200,000:115,000:120,000–30,000:1
Brightness600–1,000 nits3,850 nits800–1,500 nits
Power consumptionUp to 44% lowerLowBaseline
Front protectionIP65IP43IP40
Best forControl rooms, boardroomsCommand centres, studiosBudget indoor signage

Figures are typical values for the listed series. Final configuration is confirmed on the datasheet.

Deployments

Installed where the display has to work every day.

Case Study
McDonald's, COB menu boards for flagship stores

McDonald's

COB menu boards for flagship stores

P1.25 COB displays replaced printed menus across flagship locations, with 200,000:1 contrast keeping food imagery readable under bright restaurant lighting.

Curved transparent LED display showing an underwater scene
  • Over 40% lower energy bills
  • IP65 front face for daily cleaning
  • 3-year warranty and 24/7 support
ZTE Corporation, Command centre video wall

ZTE Corporation

Command centre video wall

A 200+ m² P0.9 COB video wall runs 24/7 for network monitoring, with redundant power and signal paths.

  • 1,137,777 pixels per m²
  • >7680Hz flicker-free capture
  • 44% energy savings
Wanda Group, Crystal film screens for mall atriums

Wanda Group

Crystal film screens for mall atriums

Self-adhesive crystal film turned glass facades into advertising surfaces while keeping 95% transparency.

  • Installed in under 3 days per site
  • 95% transparency retained
  • Advertising revenue offset the investment

How a project runs

Four steps from brief to a wall in service

  1. 01

    Share the brief

    Room drawing, viewing distance, content examples and installation type. A survey template is provided if the site is still open.

    Day 1

  2. 02

    Configuration and quote

    We confirm pitch, cabinet count, power and control, then send a quotation with the acceptance checklist for the project.

    Within 24 business hours

  3. 03

    Production and QC

    Modules are assembled, aged, calibrated and photographed in Shenzhen. Batch records follow the shipment.

    5–7 days for standard models

  4. 04

    Delivery and handover

    Drawings, packing list, commissioning settings and spare ratio are issued per project, with remote support during installation.

    On site

Client feedback

What clients say after installation

Read all testimonials
We compared three suppliers on the same drawing. XL was the only one that asked for the glass mullion spacing before quoting, and the film arrived cut to those dimensions. Installation took two nights instead of the week we had planned. The client is very satisfied with the result.
Daniel R., Project Manager

Daniel R.

Project Manager · Spain

The control room wall has been running continuously since handover. What mattered to our operators was the small map labels staying sharp at desk distance, and that has held up in daily use. We would specify the same wall again.
Marek W., Technical Director

Marek W.

Technical Director · Poland

We tour the perimeter screens through a full season. The cabinets still lock together without shimming, and the numbered flight cases mean a local crew can rebuild the wall without our team flying out. The rental package has been very reliable.
Julia K., Event Production Lead

Julia K.

Event Production Lead · Germany

Certified production, measurable output

10+
Years manufacturing
100+
Countries served
5000+
Clients worldwide
10000+
Projects delivered
CERoHSFCCULISO 9001

Document copies are supplied with the shipping papers and available on request.

Curved LED video wall installed in a broadcast studio
Broadcast studio LED wallISO 9001

What you receive with the order

Not marketing copy: the documents our engineers sign off before the cabinets leave the line.

  • 01

    Batch test report

    Brightness, dead-pixel count and flatness recorded for the exact modules in your order.

  • 02

    Approval drawing

    Cabinet layout, wiring and steel structure drawing issued for sign-off before production.

  • 03

    Certification copies

    CE, RoHS, FCC, UL and ISO 9001 documents supplied with the shipping papers.

  • 04

    Spare parts schedule

    Module, power supply and receiving card part numbers listed so reorders stay compatible.

Frequently Asked Questions

More technical answers
What is the minimum order quantity?

One cabinet is accepted for sample and quality testing. Mixed-model orders are also supported.

What is the delivery time?

Standard models ship in 5–7 days. Custom cabinets and large projects take 10–15 days after drawing approval.

Which payment methods do you accept?

T/T bank transfer, PayPal and credit card for small orders. Terms are confirmed on the proforma invoice.

What warranty do you provide?

2–3 years depending on the series, covering modules, power supplies and control cards.

Can you support installation?

We provide drawings, remote commissioning and video support. On-site engineers can be arranged for large projects.

Send Your Project Brief

Pixel pitch, viewing distance, installation type. Send what you have and we will reply with a configuration and a quote.

粤ICP备2026050467号-1