Outdoor Fixed LED960 × 960 Cabinet

Outdoor P10

The long-throw model in the 960 × 960mm cabinet family, with six 480 × 320mm modules and 6,000–12,000 nit output for large walls.

10mm

Pixel pitch

6,000–12,000 nits

Brightness

3,840–7,680Hz

Refresh rate

Outdoor P10 cabinet
Outdoor P10 cabinet · 960 × 960 × 88.5mm

Product overview

Outdoor P10 uses the 960 × 960 × 88.5mm aluminium cabinet with six 480 × 320mm modules in a 2 × 3 layout. It is specified for large roadside structures and stadium exteriors viewed from 20 metres or more, where the larger pixel is not visible and cabinet count matters more than resolution.

Every unit is assembled and tested in Shenzhen before packing. Cabinet drawings, pixel map and control-system settings are supplied with the shipment, so the configuration on site matches the quotation.

Large billboardsStadium exteriorsHighway gantriesIndustrial signage

Specifications

Pixel pitch
10mm
Brightness
6,000–12,000 nits
Refresh rate
3,840–7,680Hz
Avg power
100–200 W/m² avg
Cabinet size
960 × 960 × 88.5mm
Cabinet weight
21kg
Module size
480 × 320mm
Module resolution
48 × 32
Pixel structure
SMD2727
Module quantity
2 × 3
Scanning method
1/2S
Grayscale
16-bit
Viewing angle
160° horizontal / 140° vertical
Cabinet resolution
96 × 96
Max power
≤800 W/m²
Input voltage
AC90–264V, 47–63Hz
Operating temperature
-20°C to +60°C / 10–85% RH
Protection
IP65 front and rear
Maintenance
Front and rear service

Advantages

Engineering decisions behind Outdoor P10, and what they change on site.

01

Shared 960mm cabinet

The 960 × 960 × 88.5mm cabinet, 480 × 320mm module width and 21kg weight match P4 and P5, simplifying mixed-pitch projects.

02

High-brightness output

The 6,000–12,000 nit output keeps the image readable in direct sun and against a bright sky on long-throw walls.

03

Front and rear service

Hard connection and front access allow module and board replacement without rear clearance, with rear access available where the structure permits.

Outdoor P10

Structure introduction

Outdoor P10 is built around a sealed 960 × 960 × 88.5mm cabinet. The front module, gasket, rear cover and pressure path are designed as one weather system, so rain, dust and thermal expansion do not open a path into the electronics.

960 × 960 × 88.5mm
01

IP65 sealed enclosure

A continuous gasket runs around the module and rear cover. Cable entries use sealed glands, and the cabinet is tested before packing.

02

Module and heat sink

The LED module sits against a thermal path that spreads heat across the cabinet back. The heat sink is isolated from the sealed electronics chamber.

03

Power and control chamber

Power supplies and receiving cards are mounted in a protected chamber with a separate service cover, keeping water away from live connections.

04

Mounting and wind load

Mounting points are sized for the cabinet weight and site wind load. The structure is confirmed against the installation height before production.

Design details

The decisions that affect how Outdoor P10 looks, installs and stays serviceable on site.

01

Water path, not just a gasket

The cabinet is shaped so water runs away from the module seam. Service covers overlap the opening rather than sitting flush, which is what keeps a facade dry in driving rain.

02

Daylight brightness

6,000–12,000 nits output is paired with automatic brightness control, so the wall stays readable at noon without glare at night.

03

Thermal expansion

Module and cabinet materials are selected to expand together. The module fixing allows controlled movement instead of stressing the LED board.

04

Anti-corrosion finish

Cabinet surfaces are coated for humid and coastal sites. Fixings and grounding points are specified for long-term outdoor service.

Front maintenance

Service is planned before the wall is built. Modules, cards and power supplies are replaced from the access direction agreed on the drawing.

Front-service module design

Front service from the walkway

Modules can be released from the front where the wall faces a road or facade with no rear access. The service procedure keeps the gasket path intact.

Rear access for power and control

Where a rear walkway exists, power supplies and receiving cards are reached through a separate sealed cover without opening the module face.

Gasket and drainage checks

Service visits include a gasket inspection and drainage check. Replacement modules are supplied with the correct seal kit for the cabinet revision.

Product credibility

Documented before it ships

Outdoor P10 is built on the same production line as our project walls. Cabinets, modules and control settings are recorded per batch, and the documentation travels with the shipment so the site team is not working from memory.

ISO 9001

Factory process control

CE / RoHS / FCC

Product compliance

Batch tested

Aging and calibration record

2–3 years

Standard warranty

Quality record

  • CE, RoHS and FCC documentation for the supplied configuration.
  • Aging and white-balance calibration record per batch.
  • Cabinet drawing, pixel map and control settings in the handover pack.
  • Spare modules matched to the original production batch.

Outdoor fixed selection and delivery

Outdoor selection starts with the weather path

Brightness is only one part of an outdoor specification. Water paths, wind load, thermal expansion and service access determine whether the wall still performs after the first rainy season.

01P2.6–P10

Set brightness from the viewing direction

P2.6–P4.8 for close street viewing and building entrances; P6.67–P10 for roadside, facade and stadium distances where the nearest viewer is beyond 10 m.

02IP65 front and rear

Trace the water path

IP65 depends on gasket continuity, cable glands and cover overlap, not on a single rating label. The cabinet should shed water away from the module seam and service openings.

03Wind-load review

Confirm structure and service

Mounting points, wind load and the service route are reviewed against the installation height. Front service is used where the wall faces a road or facade with no rear walkway.

Deployment playbook

Outdoor walls where the site sets the build

A roadside billboard, a building facade and a stadium perimeter use different cabinet formats, brightness levels and service strategies.

01

Roadside and street media

The wall must stay readable in direct sun and dim at night. Automatic brightness control, high output and a sealed enclosure are the base requirements.

P4–P8 · 5,500–13,000 nits · auto dimming

02

Building facades

Wind load and fixing detail dominate. The cabinet and support frame are reviewed together, with service access planned from the facade or a maintenance walkway.

P6.67–P10 · IP65 · wind-load frame

03

Stadium perimeter

The wall is close to the pitch and on broadcast cameras. High refresh, fast-lock cabinets and a service plan for match days are part of the specification.

P4.81–P6.67 · >7680Hz · fast service

Delivery control

Outdoor build and weather test

Outdoor cabinets are assembled and sealed before packing. The factory check covers gasket continuity, cable entry and the service covers that are most likely to be opened on site.

Handover pack

  • Approved cabinet layout and pixel map
  • Control settings and calibration record
  • Packing list, spare list and service notes
Request the current datasheet
  1. 1

    Freeze the drawing

    Approved layout, pixel map and power schedule

    Cabinet layout, control points, power distribution and the service direction are fixed before materials are cut. The approved drawing becomes the reference for every later check.

  2. 2

    Match the batch

    Batch record and module position list

    LED modules, driver ICs and power supplies are drawn from the same production batch where the order size allows, then labelled by cabinet position.

  3. 3

    Age and calibrate

    Aging log and calibration file

    Assembled cabinets run through an aging cycle and white-balance calibration. Faults found at this stage are corrected before packing, not after arrival.

  4. 4

    Pack for the route

    Packing list, spare list and handover pack

    Cabinets are packed against the transport method and site access. The packing list includes the seal kit, service gaskets and the fixing schedule for the approved structure.

Buyer questions

Questions we answer before quotation

These are the points that most often change the specification after the first enquiry. If your question is not here, send it with the site details.

Ask an engineer
01Is IP65 enough for coastal installations?

IP65 is the starting point, but coastal sites also need corrosion protection, suitable fixings and a maintenance schedule. The cabinet finish and grounding detail are confirmed against the site conditions.

02How is wind load handled?

The mounting points and support structure are reviewed against the installation height, exposure and local requirements. The display cabinet is not specified in isolation from its frame.

03Can the wall be serviced from the front?

Yes, front-service modules are available for walls with no rear access. Where a rear walkway exists, power supplies and receiving cards can be reached through a separate sealed cover.

04What brightness is recommended for a roadside wall?

Outdoor walls can be configured from 5,500 to 13,000 nits with automatic dimming. The final setting depends on orientation, viewing distance and local brightness rules.

Request Outdoor P10 pricing and drawings

Send viewing distance, wall size and installation type. We reply with cabinet quantity, control layout and a quotation within 24 business hours.

  • Factory-direct pricing
  • CE / RoHS / FCC / ISO 9001
  • 5–7 day lead time for standard models
粤ICP备2026050467号-1